Vermeer Launches PD25R Pile Driver for Solar Field Construction

 

Vermeer recently unveiled the PD25R pile driver, engineered to meet the evolving demands of the growing solar market.

This new model features a 7.6-m pile driving capability, allowing solar contractors to install longer piles for larger solar arrays and on varied terrain. The PD25R's extended reach enables contractors to adapt to changing project requirements and site conditions for optimal productivity in solar field construction.

The innovative design of the Vermeer PD25R pile driver includes a telescoping mast and rotating upper half, eliminating the need for assembly and disassembly. This design allows for quick rotation and positioning of the mast, significantly optimizing setup and teardown time. For contractors, this means less non-value-added time between jobs and the ability to complete more installations in a day.

Source: Vermeer Corporation

Partagez sur Facebook / Share on Facebook   Partagez sur LinkedIn / Share on LinkedIn


© InfraStructures - Tous droits réservés - All rights reserved